11 Mar Filling is brought in Posted at 16:40h in Construction diary by Balthasar Volcano The fill is placed and the installation pipes disappear. On the upper floor – for better sound insulation – loose chippings were placed, in the basement the chippings were mixed with cement. Tags: Filling, Floor structure, Krain screeds