After spreading the glass foam insulation, the formwork for the floor slab is erected by the Scheutz company. Reinforcement or rebar is placed in the floor slab to strengthen the floor slab. The reinforced or reinforced floor slab is then filled with concrete and smoothed. For the wooden walls are then built extra 20 cm high walls. The floor slab is lined with bituminous mats and flashed to seal it.